Waste Incinerator Operation Room, inside with waste incinerator and if necessary, there will be a waste storage room beside.

Waste Incinerator Operation Room, inside with waste incinerator and if necessary, there will be a waste storage room beside.
Categories:
Tags:
HICLOVER Solution for Fighting COVID-19, with ISO9001:2015/CE(2006/42/EC,2014/30/EU) Certification.Medical Waste Incinerator |Mobile Incinerator|
Pet Animal Incinerator|Municipal Solid Waste Incinerator
Riello Burner G20 Difuser
$27.00
60 Temperature Controller Honeywell DC1040CT-301-000B-E
$200.00
Circuit board LMO44.255C2 Burner Control Box Baltur
$250.00
Model YD150 Waste Incinerator
$17000.00
Temperature Thermocouple for waste incinerator
$37.00
Controller for Riello FS10 gas burner
$100.00
Containerized Mobile Waste Incinerator
$35000.00
Ignition electrode
$30.00

Comments are closed